Builders
Builders on the Costa del Sol.
Partition walls, chasing, wall and floor tiling, screeds and building repairs in flats, villas and shops. Tell us about the job and we pass your enquiry to a collaborating builder in your area.
Typical jobs
What people usually ask a builder for
- Partition walls: building one to split a room, or removing a non-load-bearing one.
- Chasing and making good for plumbers and electricians.
- Wall and floor tiling.
- Screeds and levelling before a new floor.
- Repairs: cracked walls, loose render, broken steps, terrace walls.
For a whole bathroom, see bathroom renovation.
Minor works
When a builder is enough and when you need an architect
Spanish rules on construction waste (Royal Decree 105/2008) define minor home works as simple, small-scale jobs that do not change the volume, use, shared installations or number of homes and need no project signed by a qualified professional.
Replacing a floor or building a brick partition usually falls there. Touching a load-bearing wall, beam or slab does not: under the Building Act (Ley de Ordenación de la Edificación) work that alters the structure needs a project signed by an architect or building engineer. If you are not sure whether a wall is load-bearing, it is checked before anything is knocked down. Spain's building code also says a renovation must not leave the home worse than it was.
Rubble and asbestos
What happens to the rubble
For minor works at home, Spain's waste law (Ley 7/2022) treats rubble as household waste, and each town hall sets the rules in its bylaws: skip, bags or recycling point, and whether a permit is needed to leave it in the street. If old fibre cement appears, it may contain asbestos: only a registered company (RERA) with an approved work plan may remove it (Royal Decree 847/2026).
How it works
From enquiry to finished job
Tell us about the job
What you want done, where the property is and which language you prefer.
We pass it on
Your enquiry goes to a collaborating professional for that trade and area.
You deal with them
Visit, quote and works are agreed directly with the professional, who carries out and invoices the job.
Questions
What people usually ask
Can I remove a wall without an architect?
If it is not load-bearing, it is usually minor works. If it supports anything, a qualified professional must assess it and sign off first.
Who takes the rubble away?
That is agreed with the builder. Collection of rubble from minor works is regulated by each town hall.
Do you take on small jobs?
You can ask for any building job. Whether a collaborating professional is available for small jobs depends on the area and on timing.
Is Reformas Biznaga a building company?
No. We pass your enquiry to a collaborating builder in your area, who quotes, carries out and invoices the work.
Sources: Real Decreto 105/2008, art. 2 and first additional provision; Ley 7/2022 on waste, arts. 2 and 12; Ley 38/1999 de Ordenación de la Edificación, art. 2; Código Técnico de la Edificación, Part I art. 2; Real Decreto 847/2026 on asbestos. Checked on 23 November 2026.
Tell us about the job.
We pass your enquiry to a collaborating professional for that trade and area. They quote and do the work, not this website.